I-81 Luzerne Coordinator Reconstruction for P3

LOCATION

Wilkes-Barre, PA

CLIENT

PennDOT Engineering District 4-0

CONSTRUCTION COST

Varies

COMPLETION DATE

2020 - Current

The Lexis Group, LLC performed services in the preliminary engineering phase as a subconsultant to a Prime on the I-81 Reconstruction project in Wilkes-Barre, PA for PennDOT Engineering District 4-0.  


Work began with utility coordination beginning in August of 2020 with  Lexis performing research to prepare a utility contact list and utility mapping/utility modeling to aid in determining where subsurface utility engineering (SUE) would need to be performed once an alignment was confirmed. Lexis made updates to plans and utility modeling throughout the next few years as information became available.


In late 2023, PennDOT confirmed the alignment and Lexis identified locations where SUE would be most beneficial for design. Five (5) individual sections along the alignment were chosen for investigation. Quality Level B  designation began in January 2024, with completion in March of 2024 with survey of field markings.


TLG_Pantone_Final_Horiz_white-orange.png

Ⓒ 2026 The Lexis Group, LLC​

bottom of page